Location by department
EV charging stations: Nord (59)
The Nord (59) department has 5,916 publicly accessible charging points across 1,600 stations, according to the French national IRVE database (data as of October 13, 2026).
Including 1,646 fast-charging points (DC, 50 kW or more), or 28%.
Key figures
- Public charging points
- 5,916
- Rank 1 of 96
- Stations
- 1,600
- Points per 100,000 inhabitants
- 226.2
- Rank 45 of 96
- Fast-charging share
- 28%
- Rank 57 of 96
- Maximum power
- 600 kW
- Points per 100 km²
- 102.9
The charging network in the Nord department in detail
With 226.2 charging points per 100,000 inhabitants, the Nord department ranks 45 out of 96 in mainland France. That is close to the national average (226.6). By volume, its 5,916 points rank it 1 out of 96, for 2,615,635 inhabitants and 5,751 km², or 102.9 points per 100 km².
Fast charging (50 kW and above) accounts for 28% of points, close to the national average (27%). 1,045 points deliver 150 kW or more, and the highest declared power is 600 kW. Points are most often installed on the street (34%).
Villeneuve-d'Ascq is the best-covered town, with 64 stations and 304 points, or 5% of the department's points. The largest network is Pass pass électrique, with 926 points (16% of the total).
Breakdown by power
- Up to 7.4 kW (slow charging, AC)5109%
- 7.4 to 22 kW (standard charging, AC)3,65762%
- 22 to 49 kW1002%
- 50 to 149 kW (fast charging, DC)60110%
- 150 kW and above (ultra-fast charging)1,04518%
Connector types available
- Type 24,034
- Type E/F (Schuko)1,930
- CCS Combo1,606
- CHAdeMO174
One point can offer several sockets, so the total exceeds the number of points.
Main networks present
Brands shown on the chargers, ranked by number of points in the Nord department.
- Pass pass électrique92616%
- Iléwat65911%
- DRIVECO4828%
- Power Dot France4417%
- RossiniEnergy3426%
Where the chargers are installed
- On the street2,006
- Private car park open to the public1,973
- Public car park1,690
- Dedicated fast-charging hub232
- Customer-only car park15
Best-covered towns
| Town | Stations | Points | Of which fast |
|---|---|---|---|
| Villeneuve-d'Ascq | 64 | 304 | 97 |
| Roubaix | 57 | 116 | 16 |
| Tourcoing | 49 | 125 | 31 |
| Douai | 36 | 139 | 26 |
| Lille | 32 | 227 | 42 |
| Dunkerque | 28 | 107 | 37 |
| Hazebrouck | 26 | 105 | 10 |
| Cambrai | 24 | 72 | 27 |
Nearby departments
- Pas-de-Calais (62)3,121 points, 31% fast
- Somme (80)1,360 points, 35% fast
- Aisne (02)915 points, 39% fast
- Oise (60)1,726 points, 28% fast
- Ardennes (08)732 points, 18% fast
- Val-d'Oise (95)1,956 points, 26% fast
Frequently asked questions
How much does it cost to charge an EV in the Nord department?
The price depends on the operator and the station's power output. Our charging price comparison breaks down the rates of the main networks in France.
How do I find a fast-charging station in the Nord department?
The Nord department has 1,646 points of 50 kW and above, 1,045 of them at 150 kW or more. Among the best-covered towns, Villeneuve-d'Ascq has the most (97). On the interactive map, filter by power output to display them.
Which charging networks operate in the Nord department?
The networks with the most points in the Nord department are Pass pass électrique, Iléwat, DRIVECO, Power Dot France, and RossiniEnergy.
Is this data up to date?
The figures on this page come from the French national IRVE database, published on data.gouv.fr under the Licence Ouverte 2.0 and consolidated every night from the files operators declare. It is not exhaustive: Avere-France's barometer counts more points nationwide. The interactive map uses the same database for France.
Data: French national IRVE database (transport.data.gouv.fr), Licence Ouverte 2.0, as of October 13, 2026. data.gouv.fr
All departments