Location by department
EV charging stations: Creuse (23)
The Creuse (23) department has 333 publicly accessible charging points across 130 stations, according to the French national IRVE database (data as of October 13, 2026).
Including 96 fast-charging points (DC, 50 kW or more), or 29%.
Key figures
- Public charging points
- 333
- Rank 89 of 96
- Stations
- 130
- Points per 100,000 inhabitants
- 288.2
- Rank 18 of 96
- Fast-charging share
- 29%
- Rank 48 of 96
- Maximum power
- 200 kW
- Points per 100 km²
- 5.9
The charging network in the Creuse department in detail
With 288.2 charging points per 100,000 inhabitants, the Creuse department ranks 18 out of 96 in mainland France. That is above the national average (226.6). By volume, its 333 points rank it 89 out of 96, for 115,527 inhabitants and 5,598 km², or 5.9 points per 100 km².
Fast charging (50 kW and above) accounts for 29% of points, close to the national average (27%). 19 points deliver 150 kW or more, and the highest declared power is 200 kW. Points are most often installed on the street (36%).
Guéret is the best-covered town, with 13 stations and 45 points, or 14% of the department's points. The largest network is CPO CITEOS Mobive, with 103 points (31% of the total).
Breakdown by power
- Up to 7.4 kW (slow charging, AC)62%
- 7.4 to 22 kW (standard charging, AC)20562%
- 22 to 49 kW268%
- 50 to 149 kW (fast charging, DC)7723%
- 150 kW and above (ultra-fast charging)196%
Connector types available
- Type 2252
- Type E/F (Schuko)129
- CCS Combo98
- CHAdeMO47
One point can offer several sockets, so the total exceeds the number of points.
Main networks present
Brands shown on the chargers, ranked by number of points in the Creuse department.
- CPO CITEOS Mobive10331%
- Réseau MOBIVE8626%
- AVIA VOLT - PICOTY216%
- QOVOLTIS206%
- Freshmile France144%
Where the chargers are installed
- On the street121
- Public car park121
- Private car park open to the public84
- Dedicated fast-charging hub6
- Customer-only car park1
Best-covered towns
| Town | Stations | Points | Of which fast |
|---|---|---|---|
| Guéret | 13 | 45 | 10 |
| La Souterraine | 10 | 38 | 6 |
| Aubusson | 7 | 13 | 8 |
| Bourganeuf | 5 | 14 | 3 |
| Boussac | 3 | 11 | 3 |
| Évaux-les-Bains | 3 | 11 | 1 |
| Sainte-Feyre | 3 | 8 | 0 |
| Dun-le-Palestel | 2 | 6 | 3 |
Nearby departments
- Haute-Vienne (87)897 points, 29% fast
- Indre (36)607 points, 26% fast
- Corrèze (19)614 points, 40% fast
- Puy-de-Dôme (63)1,474 points, 31% fast
- Cher (18)580 points, 57% fast
- Allier (03)775 points, 36% fast
Frequently asked questions
How much does it cost to charge an EV in the Creuse department?
The price depends on the operator and the station's power output. Our charging price comparison breaks down the rates of the main networks in France.
How do I find a fast-charging station in the Creuse department?
The Creuse department has 96 points of 50 kW and above, 19 of them at 150 kW or more. Among the best-covered towns, Guéret has the most (10). On the interactive map, filter by power output to display them.
Which charging networks operate in the Creuse department?
The networks with the most points in the Creuse department are CPO CITEOS Mobive, Réseau MOBIVE, AVIA VOLT - PICOTY, QOVOLTIS, and Freshmile France.
Is this data up to date?
The figures on this page come from the French national IRVE database, published on data.gouv.fr under the Licence Ouverte 2.0 and consolidated every night from the files operators declare. It is not exhaustive: Avere-France's barometer counts more points nationwide. The interactive map uses the same database for France.
Data: French national IRVE database (transport.data.gouv.fr), Licence Ouverte 2.0, as of October 13, 2026. data.gouv.fr
All departments